Result: "accepted" (valid gain), "rollback" (insufficient gain), "stopped" (safety failure or no proposal).
Target prior to the proposal.
Proposed target (applied if accepted or rolled back).
Observed throughput gain (ratio - 1; e.g., 0.15 = 15% gain).
A clear description of the grounds for the decision.
Results of the evaluation of a proposal to increase capacity.